The rugged 9F.03 heavy duty gas turbine delivers efficiency, flexible operation, and reliability in one proven solution. With greater than 99% reliability and broad fuel flexibility, the 9F.03 delivers consistent performance in a multitude of diverse applications, ranging from industrial cogeneration to aluminum smelting. With a demonstrated cycle as short as eight months from order to operation, the 9F.03/.04 gets applications up and running fast, while its extended inspection intervals and robust hot gas path parts keep it online longer.
The information in this webpage is wrong or out-of-date? Please contact info(at)etn-gasturbine.eu