The FT8® MOBILEPAC® gas turbine package is the industry leader in providing state of the art technology with over 30 years of experience. After many successful years of operation, the MOBILEPAC® gas turbine package now utilizes the FT8® engine and offers 30 megawatts of movable power. Utilizing the proven SWIFTPAC® gas turbine package technology, this package is designed to provide quick, reliable power and is especially useful in emergency situations.
The FT8® MOBILEPAC® gas turbine package design includes two trailers. The first contains the gas turbine, electric generator, exhaust collector, diffuser and engine lube oil system. The second trailer carries the 15- kilovolts switchgear, control system, operation panel, protective relays, batteries and charger, motor control center and the hydraulic start package. A pre-commissioned MOBILEPAC® gas turbine package can be driven to a site and begin generating power in less than one day.
Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea or air, allowing worldwide delivery of the MOBILEPAC® gas turbine package within 24 hours.
The information in this webpage is wrong or out-of-date? Please contact info(at)etn.global