SGT-A35 | RB211 User Group Meeting 2019
ETN’s SGT-A35 (formerly Industrial RB211) User Group Meeting was held on 7-9 May 2019 in Amsterdam, Netherlands, hosted by Shell.
The SGT-A35 User group – that ETN has initiated in 2017 – was founded to help the community to share experiences, and to highlight in a coordinated way the most widespread issues users encounter while operating or maintaining a specific type of gas turbine. The point is to create the opportunity for a direct dialogue between the Users, the OEM, the Independent Service Providers (ISP) and finally the R&D community. This independent user meeting is therefore a well-tried method for open, inclusive and constructive discussions and, ultimately, concrete results.
Venue and agenda
The SGT-A35 User Group Meeting took place at Shell’s Technology Centre in Amsterdam.
This is a unique meeting where the agenda is set by the user community of this engine.
The two-day event included:
- Discussions among Users only on top issues and topics regarding the SGT-A35 |RB211 engine family;
- Sessions with ISPs and Suppliers
- An exhibition area
Click here to download the Draft Agenda of the event (v20190503)
| Index | UGM 2019 Category | Topic | 
| 23 | CAT-1 | HP Thrust Bearing | 
| 71 | CAT-1 | Alarms and trips rationalisation | 
| 92 | CAT-1 | PT Seals | 
| 116 | CAT-1 | Abradables of HP compressor | 
| 101.2 | CAT-1 | Not meeting LCP BREF Emission with DLE engine | 
| 109 | CAT-1 | Hot Corrosion on Plates Behind Fuel Injectors | 
| 119 | CAT-1 | High Temperature Spread at exhaust | 
| 123 | CAT-1 | HP turbine blade failure | 
| 103 | CAT-1 | IP turbine blade failure | 
| 102 | CAT-1 | Flooded engine due to Isolation valve closed | 
| 108 | CAT-1 | HP Oil Pump distress | 
| 120 | CAT-1 | Defective seal on pump shaft on Oil leak | 
| 122 | CAT-1 | Spare parts lead time excessively long | 
| 107 | CAT-1 | PT Inboard Bearing Seals variety of designs | 
| 110.1 | CAT-1 | PT RT61 Overhaul options | 
| 110.2 | CAT-1 | No competition on PT Overhaul | 
| 115 | CAT-1 | Power Turbine Disks and Rotor Life Assessment | 
| 111 | CAT-1 | Cables burned by Water Mist | 
| 104 | CAT-1 | Procedure to commission a DLE engine after overhaul | 
| 121 | CAT-1 | Hexavalent Chromium | 
| 24 | CAT-2 | Stage 5 & 6 HPC Cycle Fatigue | 
| 6 | CAT-2 | Dual Fuel Burners erosion/cracking | 
| 118 | CAT-2 | Welding corrosion on Exhaust Cone | 
| 112 | CAT-2 | Quill shaft – Defective Lateral Analysis on Low Speed Shaft Lines | 
| 106 | CAT-2 | PT Nozzles Module D & positioning key | 
| 105 | CAT-2 | Unbalance and Power turbine alignment | 
| 117 | CAT-2 | Starter crash re-engagement | 
| 62 | CAT-3 | Coking of manifolds on dual fuel engines | 
| 22 | CAT-3 | Compressor HP/IP Bearing Support (Spider) wear | 
| 95 | CAT-3 | Turbine Curvic Coupling corrosion | 
| 27 | CAT-3 | Compressor OGV 7th stage new design | 
| 113 | CAT-3 | Oil migration to the Bleed of Valve | 
| 114 | CAT-3 | PT instrument access vs. barrel arrangement | 
CAT-1: events with an important impact on operations and that will be focused on during discussions at the meeting.
CAT-2: events with a lower impact.
CAT-3: situations or issues that do not have high financial consequences, but could be a source of trouble on the daily operations point of view.
Contact
If you would be interested to receive more details about the event, please contact Valentin Moëns at vm[at]etn.global.
The following ETN Members are part of the SGT-A35 User Group Steering Committee:
Sponsors
The event is sponsored by the following ETN Members and partners:



















 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		 
		